A GloBird Move-In Energy Setup doesn’t need to be stressful. GloBird Energy is an independently owned Australian electricity and gas retailer known for GloBird No Lock-In Contracts, which matters most exactly when you’re moving you’re free to switch without cancellation fees weighing on the decision. This guide covers what to do before you move, how long connections actually take by state, and the difference between a reconnection and a brand-new connection.
What to Do Before You Move
Start the energy connection process before moving day so there is enough time to arrange the required connection or transfer. On the utilities side specifically, arrange your electricity and gas connection or disconnection ahead of moving day, redirect your mail, and give your current address a final clean before handover.
One point GloBird makes clearly: connections and disconnections aren’t instant, and in some cases can take a few days so timing this before moving day, not on it, avoids arriving to a property with no power.
How Long Does Electricity Reconnection Take?
Timeframes for connecting electricity at an existing property vary by state and distributor. The figures below are indicative distributor timeframes published by GloBird and can vary depending on the property, access and network requirements:
| State / Distributor | Typical Timeframe | Notes |
| VIC Citipower, Powercor, Jemena, United Energy, AusNet | 1–2 business days | |
| NSW Ausgrid, Endeavour, Essential Energy | 1–2 business days | Ausgrid may take up to 4 business days for a meter read if power is already on |
| QLD Energex | 1–2 business days (Brisbane/urban) | Up to 10 business days for Bay Islands and some rural areas |
| SA SAPN | 2–4 business days |
Disconnecting an old property requires 3 business days’ notice, per GloBird’s published process.
How Long Does Gas Reconnection Take?
| State / Distributor | Typical Timeframe |
| VIC Multinet, AusNet | 2–4 business days |
| VIC AGN | 1–2 business days |
| NSW Jemena Gas | 3–5 business days |
| QLD AGN | 1–2 business days |
| SA AGN | 1–2 business days |
New Connection vs. Reconnection: Know the Difference
It’s easy to mix up two different scenarios, so it’s worth separating them clearly. A reconnection applies when you’re moving into an existing property that has previously had power or gas connected; that’s the 1–2 to 2–4 business day range covered above. A new connection applies when a property needs a brand-new electrical connection or meter identifier, such as a new build GloBird’s published timeframe for this is 20 business days across all states, regardless of location.
If you’re moving into a recently built home, plan around the new-connection timeframe, not the shorter reconnection figures; the gap between the two is significant enough to affect your moving date.
Setting Up Energy If You’re Renting
Renters can generally set up a GloBird account in their own name for a new address the same way owner-occupiers do, without needing the retailer’s involvement from a landlord or agent.
GloBird’s Sign-Up Process, Step by Step
Once you’ve decided to switch or connect with GloBird, the process runs in a few stages: compare plans for your property type and usage, select a plan and confirm your move-in date, provide your new address and any available meter details, then choose whether you’re transferring an existing connection or requesting a new one.
If anything is unclear along the way, GloBird’s customer service team is locally based in Melbourne rather than outsourced overseas a genuine point of difference from some larger providers, and one worth calling on directly via 133 456 rather than guessing your way through the form.
What Happens After You Sign Up
This can depend on many factors such as the meter type, the region, site access and the service levels of the meter companies, but it only takes a few weeks.
Once you’ve signed up with GloBird, a Welcome Pack typically arrives within a couple of days, and it starts your 10-business-day cooling-off period. You don’t need to separately close your account with your old retailer/ GloBird handles the transfer read automatically, though a smart meter transfer read usually takes a few days to a week, while a basic meter read can take weeks to a month, and a gas meter read specifically can take a distributor up to 15 business days to process.
Move-In Energy Setup: Frequently Asked Questions
Do I need to contact my old energy retailer?
It depends. If you are switching retailer at the same property, the transfer is generally arranged through the market process. If you are moving out of another property, contact the retailer responsible for that property to close the account or arrange a final read.
How long does an electricity reconnection take with GloBird?
Most reconnections at an existing property take 1–2 business days in VIC and NSW, 1–2 business days in urban QLD (up to 10 in some rural areas), and 2–4 business days in SA.
What if I’m moving into a newly built home?
A brand-new connection (rather than a reconnection) takes up to 20 business days across all states, since it requires establishing a new meter identifier rather than reactivating an existing one.
Is there a cooling-off period when I sign up with GloBird?
Yes. GloBird’s cooling-off period is 10 business days, starting once your Welcome Pack arrives.
Ready to Set Up Energy at Your New Home?
Moving is one of the few moments where GloBird No Lock-In Contracts genuinely simplify the decision; there’s no exit fee risk in switching before or after you move. Start your GloBird Move-In Energy Setup today go straight to sign-up www.globirdenergy.com.au or call 133 456.